Kladno power plant (2004 - 2006)
- ssmida
- 17. 8. 2016
- Minut čtení: 1
GT 1 x 42 MW peak-load gas turbine (LM 6000)
Feasibility Study
Environmental Impact Assessment Document
Tender Documentation
Zoning & Construction Permit Documentation
Owner’s Engineer – Site Supervision (with Pöyry)
Client: Kladno GT, s.r.o.

Komentáře