Kladno Power Plant (2010-2014)
Unit 7 – 135 MW, Coal fired – CFB boiler General designer of civil part of : 1 x fluidized bed boiler with output 375 t/h of steam –...


Power Plant Komořany (2008 – 2013)
New unit EKY III General designer – erection of new unit 1x160MW in power plant Komořany. Feasibility study Tender Documentation...


Kladno Power Plant (1996 – 2001)
Units 4, 5 and 6 – 2 x 135 MW + 1 x 70 MW General designer of: 2 x fluidized bed boiler with output 375 t/h of steam – supplier ABB...


Power Plant Komořany (1994)
Design for construction permit for reconstruction of 10 pcs pulverized coal boilers to fluidized bed boilers. The above mentioned...


Soma Power Plant, Turkey (1980 – 1991)
Units 1 – 6 (6 x 165 MW) Participation of present employees of H&D in General designer activities: 6 x pulverized coal boiler with output...


Elbistan B Power Plant, Turkey (1995 – 1998)
Units 1 - 4 (4 x 350 MW) Design and engineering services: Steel structure of boilers Steel structure of coal handling system The total...