Planá nad Lužnicí Heating Plant (2012-2014)
- ssmida
- 20. 8. 2016
- Minut čtení: 1
General Designer of:
Study
Zoning permit documentation
Construction permit documentation
Basic design
Detail design
Installation of Rolls Royce cogeneration units with gas engines of 4 x 9175 kW electrical output and HRSG of 4 x 2850 kWth steam and 4 x 4780 kWth hot water.
Gas pipelines
Renovation of the heat distribution system
External pipeline systems for boilers
Coal Handling
Client: CE Energy, a.s. (Czech Republic)

Komentáře