Power Plant Komořany (1994)
- ssmida
- 24. 8. 2016
- Minut čtení: 1
Design for construction permit for reconstruction of 10 pcs pulverized coal boilers to fluidized bed boilers. The above mentioned documentation included Ash Handling System and Coal Handling System parts.

Comments