Unit 7 – 135 MW, Coal fired – CFB boiler
General designer of civil part of :
1 x fluidized bed boiler with output 375 t/h of steam – supplier Foster Wheeler
1 x 135MW steam turbine Škoda Doosan
Natural draft cooling tower
Coal handling system
Ash handling system
Limestone handling system
Chemical water treatment
Control system
Fire-fighting system
Stack
+
Tender Documentation, Demolition Documentation, Zoning Permit Documentation, Construction Permit Documentation, Detail Design of civil part.
Client: KAP – Kraftanlagen Power Plants GmbH