Unit 7 – 135 MW, Coal fired – CFB boiler

General designer of civil part of :

  • 1 x fluidized bed boiler with output 375 t/h of steam – supplier Foster Wheeler

  • 1 x 135MW steam turbine Škoda Doosan

  • Natural draft cooling tower

  • Coal handling system

  • Ash handling system

  • Limestone handling system

  • Chemical water treatment

  • Control system

  • Fire-fighting system

  • Stack

+

Tender Documentation, Demolition Documentation, Zoning Permit Documentation, Construction Permit Documentation, Detail Design of civil part.

Client: KAP – Kraftanlagen Power Plants GmbH


 
 
 